Azadegan highway intersection with Tehran-Karaj Freeway

Azadegan highway intersection with Tehran-Karaj Freeway

Non-level intersection of Azadegan highway with Tehran-Karaj freeway

Employer: Tehran Engineering and Civil Engineering Organization
Consultant: Rahvar Consulting Engineers

4 bridge units with a length of 80 meters each
8 seeds 26 meters and 8 feet 15 meters
Overall width of the bridge is 60 meters
Runtime: 6 months
Concrete: 34.000 square meters
Formatting: 65,000 square meters
Armature: 1,800 tons
Earthquake operations: 900,000 square meters