Non-Aligned Intersection of Boulevard of Woman - John Bazan Blvd (Kermanshah)

Non-Aligned Intersection of Boulevard of Woman - John Bazan Blvd (Kermanshah)

 

Non-Level Intersection Operation of Boulevard Woman-Boulevard of Janbazan (Kermanshah)


Employer: Kermanshah Municipality _ Road and Transportation Authority
Consultant: Consulting Engineers

Two bridge units each contain two 18-meter spans and two 14-meter spans with a width of 17.5 meters and a total length of 404 meters
Flatbed ramps embankment: 80,000 cubic meters
Concreting: 12.000 cubic meters
Reinforcement: 25,000 kg
Execution of the pile: 80 pcs each with a depth of 25 m