Part 1 / B of the Tehran-Hamedan Railway

Part 1 / B of the Tehran-Hamedan Railway

 

Part 1 / B of the Tehran-Hamedan Railway


Employer: Ministry of Roads and Transportation
Consultant: FarShar Consulting Asia Consulting Engineers

Length: 52 km

Excavation: 000 700 cubic meters

The embankment: 700 700 cubic meters

Bridges with a span of 2 to 8 meters: 212 devices

Bridges with a span of 9 to 20 meters: 8 devices