Part 1 / B of the Tehran-Hamedan Railway
Part 1 / B of the Tehran-Hamedan Railway
Employer: Ministry of Roads and Transportation
Consultant: FarShar Consulting Asia Consulting Engineers
Length: 52 km
Excavation: 000 700 cubic meters
The embankment: 700 700 cubic meters
Bridges with a span of 2 to 8 meters: 212 devices
Bridges with a span of 9 to 20 meters: 8 devices