Construction and modernization of the Shahriyar-Ashtar highway

Construction and modernization of the Shahriyar-Ashtar highway

Construction project for reconstruction and improvement of the axis of Shahriyar-Astarta-Buin Zahra

Employer: Ministry of Roads and Transportation
Consultant: Pars Consulting Engineers

Bridge rusted:
Includes 2 openings 20 and 30 meters to a width of 21 meters
Concrete: 5.021 cubic meters
Mold: 3.245 square meters
Armature: 380,000 kg

Paul Schroed (renovation and upgrading):
Each of them has 3 spans of 20 meters and a width of 11 meters
Concrete: 1.014 * 2 cubic meters
Mold: 1.821 * 2 square meters
Armature: 432,000 kg