Operation of the second line of second railway Qazvin Zanjan

Operation of the second line of second railway Qazvin Zanjan

 

Operation of the second part of Qazvin Railway Line - Zanjan

Employer: Islamic Republic of Iran Railways

Project Management: Hazara Consulting Engineers

Partner Consultant: Railroad Railway Consultant Engineers

Geotechnical Consultant: Mandro Consulting Engineers

Operation of the second part of the second railway line Qazvin-Zanjan from km 280 + 194 to + 860 + 243

Includes excavation, embankment and technical building
Excavation volume: 734.795 cubic meters
Size of the embankment: 584,000 cubic meters
Capacity: 122,500 cubic meters
Concreting: 38,000 cubic meters
Travers: 90,000
Rail: 6,500 tons