Construction of substructure works of Lot1 Mianeh-Bostanabad-Tabriz Railway Project
Construction of substructure works of Lot1 Mianeh-Bostanabad-Tabriz Railway Project
Employer: Ministry of Roads and Transportation
Consultant: Metra Consulting Engineers
:Containing of :
Aidoghmoush truss arch bridge: 100 meters length,11 meters width and 10 meters height
Execution of micro pile system for bed of the bridge and nailing system for abutment strengthening
Shahre chai bridge: 120 meters length (4*28 m spans) and 11 meters width.with columns of 10 meters height
concrete pouring : 10,268 m3
Form work : 4,885 m2
Rebar : 453 tons
Tarak road box gallery : including 2 No. arch box galleries of total 160 meters length , with the opening of 10 meters width * 7 meters height
Concrete pouring: 10,673 m3
Form work: 6.541 m2
Rebar: 135 tone
(Gharanghoo bridge : 224 m length (8*28 m spans
11m width and 10 m heigth
strengthening of river bed by micro-pile system
Concrete pouring: 6.260 m3
Form work: 6.613 square meters
Rebar: 416.009 kg