Operation of substructure of 7th track field - Ardebil

Operation of substructure of 7th track field - Ardebil

The substructure of the 7th middle railroad - Ardebil

10 km from Ardebil Station to Khalkhal road including 30 prestigious and 3 large bridges

Volume of excavation: 782,964 cubic meters
Size of the embankment: 611.798 cubic meters
Concrete volume: 20.299 cubic meters
Format: 32.793kg
Armature: 1,200 tons