Under the passage of Hasan Abad

Under the passage of Hasan Abad

Hassan Abad Transition Project

Employer: Tehran Engineering and Civil Engineering Organization
Consultant: Amud Consulting Engineers

Concreting: 9,500 cubic meters
Excavation: 17,500 cubic meters
Formatting: 5,000 square meters
Armature: 552,000 kg
Inside candle: 1.540 meters in length