The Valley of the Varzaghan Bridge, located on Lot3 Mianeh-Tabriz railway Project(2 openings 45 and 8 openings 60 meters): km 60Concrete pouring: 16,556 m3Form Work: 22,326 m2Rebar: 1,859,912 kg