The 60-meter- length trussing structure, supporting water supply pipe line to Torkaman-chai city, was successfully erected using two 150-tons  truck cranes at Lot 3 Mianeh-tabriz  Railway Project.The weight of this structure was 50 tons 

View the embedded image gallery online at:
https://waysa.ir/en-us/news/42-60-2#sigProIdfc74ae7596